Intro Video
Quality Control Plans
- 1. Manufacturing/ Receiving/ Supplier Plans
- 1.1 Ballooning
- 1.10 How to Turn a Receiving Plan into a Manufacturing Plan (and vice versa)
- 1.15 Auto Ballooning
- 1.2 Converting Between mm and in.
- 1.3 Creating Plans from Previous Revisions
First Article Inspections (FAI)
Inspections
- 3. Create and Complete Inspections
- 3.1 Uploading Inspection data from a CMM
- 3.2 Record Inspection Data Using Digital Gages or from Excel
- 3.3 Defining Sampling Rules
- 3.4 Link Gages to Inspections and Check Gage Calibration
- 3.5 SPC