Skip to main content
1factory, Inc. Help Center home page
Community Submit a request
Sign in Menu
  • All Help Videos
  • Contact Us
  • About Us
  • Blog
  • Community
  • Submit a request
  1. 1factory, Inc.
  2. Tutorial Videos

Tutorial Videos

Intro Video

  • Quick Start Introduction

Quality Control Plans

  • 1. Manufacturing/ Receiving/ Supplier Plans
  • 1.1 Ballooning
  • 1.15 Auto Ballooning
  • 1.2 Converting Between mm and in.
  • 1.3 Creating Plans from Previous Revisions
  • 1.4 Creating Plans from .xlsx Files
See all 10 articles

First Article Inspections (FAI)

  • 2. First Article Inspection (FAI)
  • 2.1 FAIs with Multiple Parts
  • 2.2 AS9102

Inspections

  • 3. Create and Complete Inspections
  • 3.1 Uploading Inspection data from a CMM
  • 3.2 Record Inspection Data Using Digital Gages or from Excel
  • 3.3 Defining Sampling Rules
  • 3.4 Link Gages to Inspections and Check Gage Calibration
  • 3.5 SPC
See all 8 articles

NCR & CAPA

  • 4. NCR
  • 4.1 Add and Manage Audit Findings
  • 4.2 Supplier Corrective Action Requests (SCAR)
  • 4.3 CAPA

Analytics

  • 5. Analytics

Gages

  • 6. Add and Manage Gages
  • 6.2 Update Gage Calibrations
  • 6.3 Gage Transactions and Tracking

Admin

  • 7.1 Add, Edit, and Deactivate Users
  • 7.2 Customize Attribute Fields

Enterprise Functions

  • 8.1 Version Control
  • 8.2 Approved Vendor List

Chinese Tutorial Videos

  • 中文版培训视频

© Theme by Customer Support Theme. All rights reserved.

© 1factory, Inc. 2011-2020.