Nearly all drawings have "notes" that must be verified during first article and or on-going production inspections.
Creating a note:
- REQUIRED: Characteristic type must be set to "Note"
- REQUIRED: The Data Type must be set to Pass/Fail (will be changed from numeric by default).
- OPTIONAL: All other fields are optional.